Padma

Sy Padma

For this refitting project, two MYT systems RF-LSCP-24 power packs have been assembled and installed to upgrade the hydraulic system.

In addition, two pumps installed on the generators have been provided and the PLC has been supplied to manage the distribution of the operating hours of the power packs.